Year 8-XIV Month 2

9 February 2008

theAbysmal Countdown to 2012: 8 weeks down, 252 to go

Noteworthy Days & Nights:

NEW 13-Day period begins

Saturday 1-XII
Month 2 Day 0
Lunation 2 Day 9

FULL MOON
Thursday 6-XVII
Month 2 Day 5
Lunation 2 Day 14

NEW XX-Glyph period begins
Monday 10-I
Month 2 Day 9
Lunation 2 Day 18

LEAP YEAR DAY between Thursday & Friday
Lunation 2 Day 22

NEW 13-Day period begins
Friday 1-XIX
Month 2 Day 13
Lunation 2 Day 23

NEW MOON -

Thursday 7-XI
Month 2 Day 19
Lunation 3 Day 0

NEW 13-Day period begins
Thursday 1-XVIII
Month 2 Day 26
Lunation 3 Day7

Note: the Leap Year Day coincident with February 29th does not have a weekday assigned to it in theAbysmal Calendar. As of February 29th, the weekdays no longer align between theAbysmal and Gregorian Calendar. They realign with the first Saturday of Year 0 (coincident with December 22nd 2012 CE).


Year 8-XIV Lunation 2

7 February 2008

Chinese New Year

 


Year 8-XIV Month 1

12 January 2008

theAbysmal Countdown to 2012: 4 weeks down, 256 to go

Noteworthy Days & Nights:

NEW 13-Day period begins
Monday 1-VI
Month 1 Day 2
Lunation 1 Day 13

FULL MOON
Tuesday 2-VII
Month 1 Day 3
Lunation 1 Day 14

NEW 13-Day period begins
Sunday 1-XIX
Month 1 Day 15
Lunation 1 Day 26

MIDDAY of Quarter 0
NEW XX-Glyph period begins
Tuesday 3-I
Month 1 Day 17
Lunation 1 Day 28

NEW MOON - Chinese, Korean, Vietnamese Lunar New Year
Thursday 5-III
Month 1 Day 19
Lunation 2 Day 0


Year 8-XIV Lunation 1

1 January 2008

join the fun of theAbysmal Calendar +1


Year 15 8-XIV Month 0

14 December 2007

Countdown to 2012 - 260 Weeks over 5 Years

The Calendar of 52 Weeks, divided into 13 Months of 4 Weeeks, or 4 Quarters of 13 Weeks. In the outer ring, each circle represents a Day, with the relative amount of light and black standing for the relative number of hours of daylight for 49 degrees North.

The Winter Solstice, December 21st, at the bottom, then clockwise through the rest of the Days, arranged in four weeks. Days marked with white text on a black background indicate the beginning, middle and end days of each quarter.


The Countdown to the Countdown Begins

23 November 2007

to Dec 21st, 2012

4 Weeks until the New Year - 16 Days until Lunation 0 begins our countdown to 2012 and the implementation of this here Calendar worldwide.

theAbysmal Calendar Site (still under construction)

ooze weblog


December 21st 2012 an updated implementation

3 March 2007

Decmber 21st 2013 CE and 2014 CE to boot.

theAbysmal Calendar’s replacement of the Gregorian Calendar has the following schedule

Gregorian: Thursday, December 20th, 2012 CE followed by

= = THE ABYSMAL DAY  = =

theAbysmal:
Zero Day - synchronise your Calendars

Gregorian:
Friday, December 21st, 2012 CE

Coptic:
12 Kiahk 1729

Julian Date:
2 456 283

Unix Time Code:
1 356 149 460

Lunation
:
Day 8

Julian:
December 8th, 2012

Hebrew (Jewish)
8th of Tevet, 5773

Islamic (Hijra)
7 Safar 1434 AH

Chinese:
Year of the Metal Rabbit
Lunar Month 11 Day 9

Persian (Jalali)
Jomeh, Dey 1, 1391

Mayan:
12.19.19.17.18, 2-Etznab, 1-K’ank’in, G7

Dreamspell:
Rhythmic Moon Day 9
Year of the Blue Resonant Storm
Kin 207

Erisian
:
Setting Orange, the Aftermath 63, Year of Our Lady of Discord 3178

theAbysmal Year from theAbysmal Day, equivalent to Friday December 21st 2012 CE to Day 364 equivalent to Friday December 20th 2013 CE has only Weekday designations, without Months.

theAbysmal Day - Friday December 21st 2012 CE - has no other designation, and represents 0 on the chronological count of days.
theAbysmal Year - from Friday December 21st 2012 CE to Friday December 20th 2013 CE - the Days are designated by numbers from 0 to 364 and the continuous cycle of 7 Weekdays.

Sunspot Cycle 24, begun near August 23rd 2006 CE (the date of the New Moon), reaches its peak in 2012 CE to 2013 CE, ending in 2017 CE or 2018 CE.

Also, the 360-Day Calendar

Saturday December 21st 2013 CE becomes an unnumbered Intercalary Day
Sunday December 22nd 2013 CE becomes Sunday Day 0 Month 0 Year 1

Sunday Day 0 Month 0 Year 2 (equivalent to December 22nd 2014 CE)
coincides with the New Moon. This designates the beginning of the Metonic Cycle of 19 Solar Years to 235 Lunations.

260-Day Calendar (1-12 by I-XX)
begins with Day 1-I equivalent to Day 351 of Year 0 (December 7th 2013 CE)

Typically, the Year bears the same designation of number and glyph as its first Day. TheAbysmal Calendar uses the last Day of one Year to designate the next Year.

Thus, 1-XIV, the last Day of Year 0 provides Year 1 with the additional designation of 1-XIV. This becomes useful when one considers the 52-Year Cycles intrinsic in the interactivity of the Calendars, represented numerologically by the number 13 66 560.

360-Day Calendar (20 x 18 + 5)
begins Day 120 of Year 0 (April 20th 2013 CE)


Happy New Month!

26 October 2006

Penultimate period of Year -7

Synaptic Reform Calendar Summary

The Synaptic Reform Calendar’s Month 11 of Year -7

from:
Gregorian - Thursday October 26 2006
Synaptic — Sunday Day 0 Month 11 Year -7

to:
Gregorian - Wednesday November 22 2006
Synaptic — Saturday Day 27 Month 11 Year -7


going to any New Month parties, or making any New Month resolutions?

2248 Days until implementation.


Implementation of the Synaptic Calendar

18 July 2006

Winter-Lunar Calibration of the Chinese Lunar and the Synaptic calendars.

Friday December 21, 2012 BCE ( 0-Day) measures:

day 0 - chronological
Null Day - 365-day
Null Day - 260-day

Saturday December 22, 2012 BCE measures:

day 1 - chronological
Green Intercalary Day - 365-day
day 209 - 260-day (equivalent to 1-Muluc*)
Sunday December 23, 2012 BCE measures:

day 2 - chronological
White Sunday day 0.month 0. year 0 - 365-day
day 211 - 260-day (equiv: 2-Ok)

Monday December 24 2012 BCE measures:

day 3 - chronological
Blue Monday day 1. month 0. year 0 - 365-day
day 212 - 260-day (equiv: 3-Chuen)

Tuesday December 25 2012 BCE measures:

day 4 - chronological
Yellow Friday day 2. month 0. year 0 - 365-day
day 213 - 260-day (equiv: 4-Eb)

etc…

Sunday February 10 2013 BCE measures:
Chinese Lunar New Year - Water Snake

day 53 - chronological
Red Sunday day 21. month 3. year 0 - 365-day
day 1 - 260-day (equiv: 1-Imix**)

* 1-Muluc represents the first day of the last 52-days of the Sacred Calendar. Traditionally, the year was marked by one of four glyphs Muluc, Ix, Cauac, Kan (Moon, Jaguar, Storm, Seed) and 1 of 13 numbers, as determined by new year’s day.
** 1-Imix is the first day of the 260-day calendar, and the glyph is typically referred to as Dragon. As in Chinese belief, the Dragon represents a fundamental force of nature.


64 trigrams

17 July 2006

4 colours and 3 trigrams = 4×4x4 = 64